1st Floor Framing
More 1st Floor Framing: Got the electrical panel installed and started the 14' tall walls. Also got one corner of the house logs cut and...
![](https://static.wixstatic.com/media/0c8fc4_1950d9856a1e4cddb0df9998a4e25bad.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_1950d9856a1e4cddb0df9998a4e25bad.webp)
![Septic Tank & Drain Field Installation](https://static.wixstatic.com/media/0c8fc4_1950d9856a1e4cddb0df9998a4e25bad.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_1950d9856a1e4cddb0df9998a4e25bad.webp)
Septic Tank & Drain Field Installation
UPDATE 4/15/16 Backfill Drone Flight: TIme Lapse Video Installed the new septic tank and drain field. Time Lapse Video:
![](http://img.youtube.com/vi/o5gshY3tX0I/mqdefault.jpg)
![Drone Shots](http://img.youtube.com/vi/o5gshY3tX0I/mqdefault.jpg)
Drone Shots
Flights on the evening of 4/6/16 after slab was poured. A little windy so I didn't take it up to high. Flight on 3/12/16 after backfill...
![](https://static.wixstatic.com/media/0c8fc4_b8ea0350be824547aa892bed52fcf0e3.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_b8ea0350be824547aa892bed52fcf0e3.webp)
![Interior Concrete Slab](https://static.wixstatic.com/media/0c8fc4_b8ea0350be824547aa892bed52fcf0e3.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_b8ea0350be824547aa892bed52fcf0e3.webp)
Interior Concrete Slab
UPDATE: 4/6/16 Slab poured today! YAHOOOOO!! Time Lapse Videos: UPDATE: 3/30/16 Installation of rebar. Time Lapse Video Of Rebar...
![](https://static.wixstatic.com/media/0c8fc4_47a696982ca447a69350f5f2a2dd9a28.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_47a696982ca447a69350f5f2a2dd9a28.webp)
![Lumber](https://static.wixstatic.com/media/0c8fc4_47a696982ca447a69350f5f2a2dd9a28.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_47a696982ca447a69350f5f2a2dd9a28.webp)
Lumber
Lumber for the first floor was delivered on Friday April 1st. Waiting on the slab to be poured. Didn't have much to do so I graded...
![](https://static.wixstatic.com/media/0c8fc4_f58bbfecc5184b1b8a2b28f2fe40e6b0.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_f58bbfecc5184b1b8a2b28f2fe40e6b0.webp)
![Radiant Heat System](https://static.wixstatic.com/media/0c8fc4_f58bbfecc5184b1b8a2b28f2fe40e6b0.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_f58bbfecc5184b1b8a2b28f2fe40e6b0.webp)
Radiant Heat System
A VERY BUSY AND PRODUCTIVE WEEKEND!! Starting With A Long Day On Friday..... Vapor Barrier and Foam Board Installation. 6 Mil. Vapor...
![](https://static.wixstatic.com/media/0c8fc4_6496525dca8a4be0823c782db6c5d529.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_6496525dca8a4be0823c782db6c5d529.webp)
![Sleeves, Stem Wall Insulation, & Backfill](https://static.wixstatic.com/media/0c8fc4_6496525dca8a4be0823c782db6c5d529.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_6496525dca8a4be0823c782db6c5d529.webp)
Sleeves, Stem Wall Insulation, & Backfill
Update: March 18, 2016. Final Graded and Compaction of 1" Crushed Gravel. Saturday March 12, 2016. Backfilled for slab. Still need to...
![](https://static.wixstatic.com/media/0c8fc4_abe4ad2966394086b74be248a979fbdd.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_abe4ad2966394086b74be248a979fbdd.webp)
![Stem Walls](https://static.wixstatic.com/media/0c8fc4_abe4ad2966394086b74be248a979fbdd.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_abe4ad2966394086b74be248a979fbdd.webp)
Stem Walls
Update: Time Lapse Video of form stripping and first load of gravel. Started to bring in the backfill gravel on Monday night. Using 1"...
![](https://static.wixstatic.com/media/0c8fc4_2bd3f3e5e7734d5b9eb3726672787282.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_2bd3f3e5e7734d5b9eb3726672787282.webp)
![Water Supply Line](https://static.wixstatic.com/media/0c8fc4_2bd3f3e5e7734d5b9eb3726672787282.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_2bd3f3e5e7734d5b9eb3726672787282.webp)
Water Supply Line
Trenched the new water line, installed the new pipe, and tracer wire yesterday evening. Passed the inspection today and installed the...
![](https://static.wixstatic.com/media/0c8fc4_878c3c813796498792325d3c8d79c44c.jpg/v1/fill/w_250,h_250,fp_0.50_0.50,q_30,blur_30,enc_auto/0c8fc4_878c3c813796498792325d3c8d79c44c.webp)
![Siding Examples](https://static.wixstatic.com/media/0c8fc4_878c3c813796498792325d3c8d79c44c.jpg/v1/fill/w_271,h_204,fp_0.50_0.50,q_90,enc_auto/0c8fc4_878c3c813796498792325d3c8d79c44c.webp)
Siding Examples
Built some mockups of some siding options. I still need to stain them. Option 1 - Log Veneer Option 2 - 12" Board with 3" Batten Option...