Radiant Heat System

A VERY BUSY AND PRODUCTIVE WEEKEND!!

Starting With A Long Day On Friday.....

Vapor Barrier and Foam Board Installation. 6 Mil. Vapor Barrier With 2" Rigid Foam Board (R-10) And 2" of 3/4" Road Mix Gravel On Top. The Wind Did Not Help.

Time Lapse Video:

Saturday Afternoon......

Final Grading of 2" Gravel Layer. This Is The Final Grade That The Concrete Will Be Poured On.

Time Lapse Video:

Finishing With Another Long Day On Sunday......

Installed Wire Mesh And Radiant Heat Pipe. I also Dug Out The Bases For A Future Car Lift. Installed 1,500' Of 1/2" Pex Pipe For The Future Radiant Floors. 6 Circuits For A Total Of 12 Pipes Into A Temporary Manifold. Ready For Concrete!!