Radiant Heat System
A VERY BUSY AND PRODUCTIVE WEEKEND!!
Starting With A Long Day On Friday.....
Vapor Barrier and Foam Board Installation. 6 Mil. Vapor Barrier With 2" Rigid Foam Board (R-10) And 2" of 3/4" Road Mix Gravel On Top. The Wind Did Not Help.
Foam Board Foam Board Foam Board Foam Board Foam Board Foam Board Foam Board
Time Lapse Video:
Saturday Afternoon......
Final Grading of 2" Gravel Layer. This Is The Final Grade That The Concrete Will Be Poured On.
Final Grade Final Grade Final Grade Final Grade Final Grade Final Grade Final Grade Final Grade - Mechanical Room Final Grade - Mechanical Room
Time Lapse Video:
Finishing With Another Long Day On Sunday......
Installed Wire Mesh And Radiant Heat Pipe. I also Dug Out The Bases For A Future Car Lift. Installed 1,500' Of 1/2" Pex Pipe For The Future Radiant Floors. 6 Circuits For A Total Of 12 Pipes Into A Temporary Manifold. Ready For Concrete!!
Installing Radiant Pipe Radiant Pipe Radiant Pipe Radiant Pipe_20160320_194227101_TOP Radiant Pipe_20160320_194241110_HDR Radiant Pipe Radiant Pipe To The Manifold Start Of Temporary Manifold Start Of Temporary Manifold To The Manifold To The Manifold To The Manifold Temporary Manifold
Time Lapse Video:




















Comments