Sleeves, Stem Wall Insulation, & Backfill

Update: March 18, 2016. Final Graded and Compaction of 1" Crushed Gravel.

Saturday March 12, 2016.

Backfilled for slab. Still need to final grade and compact.

Time Lapse Video of backfill:

Installed water line, irrigation line, and sleeves into Mechanical Room. Installed 4 extra 2" sleeves for any future needs.

Friday March 11, 2016 Installed insulation board on stem walls. 2" Rigid Foam Board with an R-10 value. Glued and nailed to the stem walls.

Time Lapse Of Stem Wall Insulation:

Camera 1

Camera 3