Sleeves, Stem Wall Insulation, & Backfill
Update: March 18, 2016. Final Graded and Compaction of 1" Crushed Gravel.
![](https://static.wixstatic.com/media/0c8fc4_6496525dca8a4be0823c782db6c5d529.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/0c8fc4_6496525dca8a4be0823c782db6c5d529.jpg)
Saturday March 12, 2016.
Backfilled for slab. Still need to final grade and compact.
Time Lapse Video of backfill:
Installed water line, irrigation line, and sleeves into Mechanical Room. Installed 4 extra 2" sleeves for any future needs.
Friday March 11, 2016 Installed insulation board on stem walls. 2" Rigid Foam Board with an R-10 value. Glued and nailed to the stem walls.
Time Lapse Of Stem Wall Insulation: