Search
Stem Walls
- nshooty
- Mar 11, 2016
- 1 min read
Update: Time Lapse Video of form stripping and first load of gravel.
Started to bring in the backfill gravel on Monday night. Using 1" crushed and hoping that 5 loads at 6 tons a load will be enough.
The Forms were stripped off of the stem walls on Monday.
Stem Walls poured today.
Time lapse video of the work
Forms all ready for mud. Pour tomorrow!!
Started forming the stem walls.
Starting the stem wall forms.
Commenti